📊 Data Management · China Assessment Scheme

The DCMM Data Management Maturity Guide

DCMM is not "buying a certificate". It grades your data management capability into levels. Five levels, eight capability domains, and Level 3 is the target the majority of enterprises should genuinely aim at; Levels 1 and 2 carry limited weight in practice.

The Short Answer

If you only remember three sentences, remember these three:

One, DCMM is a "capability grading", not a "paperwork pass". What the assessment body wants to see are the data management activities the enterprise actually runs — whether the policies have landed, whether responsibility sits with named people, whether data quality closes the loop. A pile of documents improvised at the last minute will not survive an on-site review.

Two, Level 3 is the realistic target for the majority of enterprises. Level 1 means "basically no system"; Level 2 means "policies and posts have started to exist". Those two levels carry limited persuasive weight in bidding, performance assessment and data-on-balance-sheet scenarios, and many tender documents write the threshold at Level 3 outright. Levels 4 and 5 rest on quantified indicators and long-term data accumulation; they cannot be rushed through in a few months.

Three, DCMM assesses "data management capability as a whole", not data security specifically. For a security-specific scheme, look at DSMM; for an internationally recognised information security management system certification, look at ISO 27001. The three have different positions, can be combined, but cannot substitute for one another.

In one line: DCMM makes "is data managed well or not" something that can be graded, compared and externally relied upon. Its value lies in turning data governance from a slogan into a set of verifiable actions.

Certification Overview

This table sets the basic coordinates first: who promotes it, what is assessed, how many levels there are, and how the result is used.

ItemGoverning and promoting systemAssessment objectLevelsReference notes
DCMM data management capability maturity assessmentAn assessment system in the domestic data management field, implemented by qualified assessment bodiesThe data management capability of the enterprise (organisation) as a wholeLevel 1 to Level 5, five levels in totalThe level result is issued by the assessment body; the certificate has a validity period, subject to current rules
What the assessment coversDeveloped within the same system8 capability domains: Data Strategy, Data Governance, Data Architecture, Data Application, Data Security, Data Quality, Data Standards, Data LifecycleEach domain is rated, then an overall level is formedThe specific clauses of the capability domains are subject to the current version of the standard
Common acceptance scenariosTender issuers, group headquarters, supervisory authoritiesBid qualification and scoring, data asset capitalisation, group digitalisation performance assessmentLevel 3 or above is usually requiredThe acceptance criteria are subject to the tender documents and the requirements of the authority in force at the time
Relationship with DSMMTwo independent systems that can be combinedDCMM assesses data management as a whole; DSMM focuses on data security capabilityEach is rated independentlyThey cannot substitute for each other
Relationship with ISO 27001Domestic assessment system vs international standard certificationDCMM assesses data management capability; ISO 27001 assesses the information security management systemISO 27001 is a certification and has no maturity levelsThey cannot substitute for each other

What DCMM Actually Assesses

People who work with data often hold an illusion: that data governance is "an internal matter" nobody outside can see. DCMM exists precisely to refute that — it breaks "how well is data managed" into a set of actions that can be checked against a list, discussed in interviews and sampled at random, and then maps those actions onto different maturity levels.

So the landing point of the assessment is not "have you ever written a data governance plan", but "does this plan have a corresponding organisation, budget, regular meeting and performance assessment, and has it actually driven anything in the past period". Assessment bodies typically cross-verify through document review, personnel interviews and system sampling: is the process written in the documents the same process the business staff describe?

This also explains why some enterprises produce very thick materials and still get held down a level: the documents were "written out", not "run out". Data management maturity is essentially an organisational state, and documents are only the shadow of that state. A shadow can be drawn in advance, but one question on site exposes it.

Looked at from another angle, DCMM is useful beyond the certificate. It provides a shared language: the business department says "the data is wrong", the IT department says "the source is not governed", and management hears two unrelated sentences. Once aligned through the capability domains, those arguments turn into concrete to-do items — which domain lacks a policy, which domain lacks indicators, which domain lacks an accountable owner.

How the Five Levels Are Divided

The five levels are one continuous slope, not five labels you can pick at will. Skipping levels is very hard to sustain in practice, because the requirements of a higher level usually presuppose that the lower level has landed.

LevelNameTypical statePractical meaning
Level 1InitialData management is largely reactive; policies and fixed accountable owners are missing, and problems are solved through ad hoc coordinationA starting marker with limited external persuasive weight
Level 2ManagedPolicies and posts begin to be established and key data activities have owners, but cross-departmental coordination is unstableThere is a foundation, yet it still struggles to meet the threshold of the majority of tenders
Level 3RobustPolicies form a system and are running; the eight capability domains have relatively complete mechanisms and cross-departmental coordination is routineThe realistic target for the majority of enterprises, and a common acceptance threshold
Level 4Quantitatively ManagedQuantifiable indicators are used to measure the effectiveness of data management, and process control can be based on dataRequires accumulated indicators and historical data to support it
Level 5OptimizingContinuous improvement mechanisms are mature and data capability forms a loop with business innovationOnly a minority of organisations reach it; not suitable as a short-term target
Why emphasise Level 3? Because it is the watershed between "the system is running" and "the system is not yet running". At Level 3, policy, organisation, process and performance assessment mesh with one another; below Level 3, many actions are still driven by individuals rather than by mechanisms. As for Level 4 and beyond, what is tested is quantitative capability, which needs time to accumulate and cannot be hurried.

The Eight Capability Domains: A Self-Check List

The eight capability domains are not eight departments but eight viewpoints. The same enterprise, viewed from these eight angles, will show different problems. When doing a gap analysis, going domain by domain against the list is far more useful than saying vaguely "our data management is poor".

Capability domainThe question it cares aboutWhat it usually looks like inside an enterprise
Data StrategyShould data be managed as an asset, and are the goals and the path clearData positioning and goals, implementation path, organisational and resource support
Data GovernanceWho is accountable, how decisions are made, how performance is assessedGovernance organisation, policy system, division of responsibilities, assessment and communication mechanisms
Data ArchitectureWhere data sits, how it flows, how it is sharedData models, data distribution, integration and sharing methods
Data ApplicationWhat data is used for and how the value shows upData analytics applications, external data services, value conversion paths
Data SecurityHas classification and grading been done, and do permissions and audit keep upSecurity policy, classification and grading, access control, audit and emergency response
Data QualityIs the data accurate and complete, and how are problems closed outQuality rules, monitoring mechanisms, problem detection and remediation loop
Data StandardsAre definitions unified, and is the same indicator the same calculationBusiness terminology, master data, indicator and coding standards
Data LifecycleFrom creation to archiving and destruction, is every stage ownedStage-by-stage management of collection, storage, use, sharing, archiving and destruction

There is a small trick when self-checking: first look at "is there a person" and "is there a record", then look at "is it done well". Many enterprises stall below Level 3 not because the method is wrong, but because certain domains sit permanently in a state of "someone manages it ad hoc, but no fixed records exist". The assessment wants a traceable chain of evidence, and results produced ad hoc leave no trace behind.

Who Can Assess, and How It Works

DCMM is implemented by qualified assessment bodies, which conduct the assessment and issue the level result. When choosing, an enterprise should focus on two things: whether the body's qualification scope covers the level and industry you intend to apply for, and whether the assessment team genuinely understands your business scenario. We do not list specific bodies here; the qualification information published for the current period governs.

1

Set the level and scope

Determine the target level in line with the acceptance scenario, and define the organisational and business scope the assessment covers

2

Gap analysis

Go item by item through the eight capability domains and identify where policies, records or indicators are missing

3

Fill mechanisms, not files

Get the missing actions actually running, and produce meeting, ledger, inspection and remediation records

4

Assemble the evidence

Organise policies, processes, records, system screenshots and indicator data by domain into a chain of evidence

5

On-site assessment

Document review, personnel interviews and system sampling are cross-checked to verify that materials and operation agree

✓

Result and improvement

After obtaining the level result, keep improving against the assessment findings and leave headroom for the next re-assessment

On timeline and cost: these depend on the target level, the scope covered, the existing foundation and the body's scheduling, subject to the assessment of the body. Any claim that gives a fixed number deserves caution — for the same Level 3, an enterprise that has run data governance for three years and one starting from zero differ by an order of magnitude in workload.

Which Enterprises It Suits

Not every enterprise needs DCMM. The test is simple: is there an external scenario asking "how well is your data managed"? If not, solving your internal data problems first is more practical than obtaining a level.

Bidding on government and state-owned enterprise data projects

The tender documents make the data management capability level a qualification condition or a scoring item. Such demand is clear and the milestones are defined, which makes it the commonest trigger. The specific acceptance criteria are subject to the tender documents.

Preparing for data asset capitalisation

For data to be recognised as an asset, ownership, quality and the management process must be explained clearly. The eight DCMM capability domains map exactly onto that explanatory logic and reduce communication cost with auditors and valuers.

Group digitalisation performance assessment

The group brings data management into the assessment of its subsidiaries and needs a relatively uniform yardstick. DCMM level results make horizontal comparison easy and help headquarters identify weaker units.

Data governance will not move

It has been pushed internally for years and business departments still cooperate reluctantly. Using an external assessment to build consensus and pressure is often more effective than an internal circular — this is the real motive for a good number of enterprises.

About to build a data platform or master data

Assessing before deploying systems avoids "the system is built but the standards are not set". The standards and responsibility allocation produced by the assessment are themselves the prerequisite input for system construction.

Not recommended to start yet

Enterprises with little data, no clear data application scenario and no external acceptance requirement are better off doing basic governance first. Certifying for the sake of certifying gives a poor return on investment.

Relationship with DSMM and ISO 27001

These three names are often asked about together, yet they answer three different questions. Discussing them as one thing easily leads to a wrong budget.

SystemWhat it assessesNatureTypical use scenarioCan they substitute for each other
DCMMData management capability as a whole, covering the eight capability domainsAn assessment system in the domestic data management field, in five levelsBidding on data projects, data asset capitalisation, group digitalisation performance assessmentNo
DSMMData security capability, focused on protection of data at each stageA domestic data security capability maturity modelDedicated data security programmes, external demonstration of security capabilityNo; it cannot replace DCMM's governance perspective
ISO 27001The information security management system, covering the organisation's information security risk managementAn international standard certification; the result is pass or failDemonstrating information security management externally, cross-border cooperation and tenderingNo; it cannot replace DCMM's data management perspective

DCMM and DSMM: the whole and the specialism

DCMM assesses "data management capability as a whole", while DSMM specialises in "data security capability". One covers a wide area, the other drills deep. They can be combined: use DCMM first to lay the foundations of governance structure, standards and quality, then use DSMM to deepen the security line.

Conversely, doing DSMM without DCMM easily produces a situation where "security is managed in fine detail, but data definitions remain chaotic"; doing DCMM without DSMM leaves the security domain as the part that regularly loses points in an assessment.

DCMM and ISO 27001: domestic assessment and international certification

ISO 27001 is information security management system certification under an international standard, and the result is "certified"; DCMM is a data management capability assessment under a domestic system, and the result is "reaching a certain level". The two use different frames of reference, and one set of documents cannot satisfy the requirements of the other.

If an enterprise needs both, it is advisable to proceed in sequence rather than launching them at the same time — the documentation system, the interviewees and the responsible departments overlap heavily, and running both together will exhaust the team. The order depends on the requirements of customers and tender issuers: satisfy the hard threshold first.

Further reading: for a comparison when choosing between management system schemes, see How to choose between ITSS, CMMI, DCMM and CSMM; for the implementation path, see the DCMM assessment practice guide; on the information security side, see ISO 27001 and the CCRC information security service qualification.

Common Pitfalls

PitfallHow it shows upHow to avoid it
Treating it as "buying a certificate"Only materials are prepared and no mechanism is built, so the on-site interview cannot be answeredBuild the operating mechanism before talking about documents; the chain of evidence must trace back to a date and an accountable person
Going straight for Level 4No quantified indicators and no historical data, and the target is set too highConsolidate Level 3 first and accumulate indicators for one to two years before discussing an upgrade
Business departments absentEverything is done by the IT and information departments, and the business definitions do not match during interviewsBring business, finance and legal in at project kick-off and name the owner of each domain
Materials and reality disconnectedThe policies are comprehensive, but no corresponding record can be found in the systemsUse "can the system be queried, is the ledger updated" as the acceptance criterion
Confusing DCMM with DSMMAssuming that doing data security means doing data managementSelf-check against the eight capability domains; security is only one of them
Ignoring the certificate validity periodThe mechanisms stop after certification and the system has dispersed by re-assessmentEmbed the assessment requirements in the annual performance assessment; validity is subject to current rules
Expecting one certificate to settle capitalisationAssuming that having a level means the data asset can be recognisedCapitalisation involves ownership, measurement and audit; the level is only one piece of supporting evidence of management discipline

Key Information

Name of the systemDCMM (Data Management Capability Maturity assessment)
Nature of the systemAn assessment system in the domestic data management field, not an international certification
Assessment objectThe data management capability of the enterprise (organisation) as a whole
Level structureLevel 1 Initial, Level 2 Managed, Level 3 Robust, Level 4 Quantitatively Managed, Level 5 Optimizing
Capability domainsData Strategy, Data Governance, Data Architecture, Data Application, Data Security, Data Quality, Data Standards, Data Lifecycle
Implementing partyQualified assessment bodies; the qualification scope is subject to the information published for the current period
Form of resultA level result issued by the assessment body; the certificate has a validity period, subject to current rules
Realistic targetThe majority of enterprises target Level 3; Levels 1 and 2 carry limited external acceptance value
Common driversBidding on government and state-owned enterprise data projects, data asset capitalisation, group digitalisation performance assessment
Related systemsDSMM assesses data security specifically; ISO 27001 is information security management system certification. The three can be combined but are not interchangeable
Cost and timelineSubject to the assessment of the body; varies with the target level, the scope covered and the existing foundation
Basis of the clausesThe specific requirements of the capability domains and levels are subject to the current version of the standard

FAQs

At which level do enterprises usually start with DCMM? Can we apply directly for Level 3?
The majority of enterprises target Level 3, but the level applied for depends on the existing foundation. Levels 1 and 2 mainly mark a starting state and often fall short of the threshold in bidding and performance assessment scenarios, so in practice few enterprises set up a project specifically for Levels 1 to 2. As for applying directly for Level 3, that depends on whether your policies form a system and whether all eight capability domains have operating records, which requires a gap analysis first. The specific acceptance rules are subject to the requirements of the assessment body in force at the time.
Do we need both DCMM and DSMM?
It depends on your acceptance scenario. If the tender issuer wants a data management capability level, do DCMM; if it wants proof of data security capability, do DSMM. The perspectives differ: DCMM assesses data management as a whole, DSMM specialises in data security capability, and they can be combined but cannot replace each other. With a limited budget, do the one that corresponds to the hard threshold first and leave the other for the next cycle. What the majority of enterprises do is use DCMM as the base — laying down governance structure, standards and quality — and then deepen security as a dedicated programme.
Does a DCMM certificate have a validity period? What happens at expiry?
Yes, it has a validity period; the specific number of years and the re-assessment arrangements are subject to current rules. What needs thinking through in advance is this: the validity period tests "continued operation", not "exchange the certificate at expiry". If the mechanisms stop after certification, the accountable people change and the regular meetings no longer happen, the re-assessment will be visibly difficult. The steadier approach is to embed the assessment requirements in the annual data management performance assessment, so that records accumulate naturally in daily work instead of being patched together before expiry.
With a DCMM level, do we still need ISO 27001?
The two serve different purposes and usually cannot substitute for each other. DCMM is a domestic data management capability assessment and the result is reaching a certain level; ISO 27001 is information security management system certification under an international standard and the result is being certified. In scenarios such as cross-border cooperation and overseas customer due diligence, the other side usually looks at ISO 27001; in domestic data project bidding, it usually looks at the DCMM level. If both are needed, proceeding in stages is advisable to avoid stacking documentation and interview pressure. Cost and timeline are subject to the assessment of the body.

Decide which level to aim for before discussing investment

Tell us your industry, your current data situation and your acceptance scenario, and we will help you judge whether the target level is realistic and which capability domains the gaps concentrate in

📞 Free Assessment